KOMPLEKSOWE USŁUGI BUDOWLANE

logo2-320x110

GEMTECH - INDUSTRIAL CONSTRUCTION

THE KNOWLEDGE, TECHNOLOGY AND EXPERIENCE YOUR BUSINESS NEEDS

GEM Technology was founded in 2016 and specializes in the field of industrial construction. The procedures and models of cooperation we have developed, complemented by individual approach to the clients’ needs, have enabled us to complete over 700 projects.

We understand the challenges faced by the industrial sector when adapting existing production facilities and properties to changing legal and technological requirements. Thanks to our knowledge and experience, we have created specialized teams that will deliver any investment regardless of its size and requirements.

We rely on proven procedures

We approach each partner individually. Our cooperation begins with a business analysis and the creation of a project concept.

This allows us to identify the full spectrum of requirements that must be met for the investment to succeed within the specified time frame and, most importantly, budget. Skilful project management from the very beginning often enables us to start construction work as early as the concept and design stage.

We understand the importance of time

For the client, a downtime of even several days could represent a potential financial loss, or even a loss of their market leader position.

That’s why we operate in a ‘here and now’ model, which means no unnecessary delays in our actions and communication. A quick quote, necessary analysis, and the ability to start work within only a few days of the first meeting with the investor are advantages that our business partners benefit from.

comprehensive approach to investments

We understand the potential procedural complexity of construction projects and the requirements imposed on investors.

We are there for our partners at every stage of the work and, most importantly, manage the entire construction process, including assistance with obtaining the necessary permits, preparing technical documentation and acceptance documents. You can count on our expertise and our support.

our advantages

Industrial construction specialists

Our expertise allows us to handle any construction project in a comprehensive manner. We understand the legal, technological, and business requirements of investments, regardless of their scale or complexity. We can meet any challenge and safely bring the project to completion.

Experience in change management

Industrial construction is an area characterized by high variability. This is influenced by market, technical, and legal factors. Over the last few years, we have developed a working methodology and built teams that can efficiently respond to changes occurring at every stage of the project.

Managing highly complex projects

Every investment is unique, just as the requirements set by business partners vary with each collaboration. Since 2016, we have specialized in managing multi-stage construction projects that require individual approach and preparation in order to be delivered.

Secure investment implementation

The experience we have gained from many implementations allows us to quickly respond to changes and adapt the course of work to the requirements set by the market. This gives the investors a guarantee that projects will be completed on time and within the budget specified in the analysis.

Selected successful implementations

CLEAR ROOM FOR LG ELECTRONICS

Investor ‒ LG ELECTRONICS

Investment date ‒ 2020

Place of investment ‒ Mława

Description of the investment 

The works included the construction of specialized Clean Rooms that maintain constant humidity and temperature. These conditions meet the needs of the TV production line’s technological process. The structural, construction, and installation works necessary to complete the project were carried out on an area of 1500 m². The investment was implemented during uninterrupted production at the LG site. Short timeframe for completing the works proved an additional challenge.

Main stages of the project:

  • structural work 
  • construction work
  • sanitary and electrical installation works

WAREHOUSES FOR LT PRECISION POLAND

Investor ‒ LT PRECISION POLAND

Investment date ‒ 2017-2022

Place of investment ‒ Siechnice

Description of the investment

The project focused on the refurbishment of 12,000 m² warehouse halls, intended to ultimately become warehouse facilities with infrastructure tailored to the client’s needs. The main challenge that arose in this project was the need to build an underground water tank in a location with restricted access. Additionally, the work had to be divided into short stages, requiring coordination of tasks for each team and a well-thought-out work plan.

Main stages of the project:

  • design works
  • construction works
  • sanitary and electrical installation works
  • construction of a reinforced concrete water storage tank in the basement of the building

FA REMODELING FOR LG ENERGY SOLUTION

Investor ‒ LG ENERGY SOLUTION

Investment date ‒ 2022

Place of investment ‒ Biskupice

Description of the investment

The aim of the project was to convert and prepare premises suitable for the production of electric car batteries. The works took place in areas spanning 1,200 m² and included design and construction tasks. Sanitary and electrical installations were also completed. For this project additional documentation and periodic reports were required, which is common in collaborations with corporate clients. The short project turnaround time and the design changes occurring during the works posed additional challenges.

Main stages of the project:

  • design work
  • construction work
  • sanitary and electrical installation works

KOMAROM FOR SK BATTERY HUNGARY

Investor ‒ SK BATTERY HUNGARY

Investment date ‒ 2020

Place of investment ‒ Debrecen

Description of the investment

The main task in this project was the construction of process plants with diameters above DN600. The work took place during the COVID-19 pandemic, which required additional safety measures as well as maintaining high morale of the crew who could not return to their families during the investment. An additional challenge was the fact that 90 welders were supervised by only two engineers.

Main stages of the project:

  • installation the steel pipe systems
  • preparation of a special workshop for welding and prefabricating several hundred b-pass sets
  • commissioning and subsequent calibration of the installation
  • insulation of pipelines

MAINTERENCE FOR LG ENERGY SOLUTION

Investor ‒ LG ENERGY SOLUTION

Investment date ‒ 2022

Place of investment ‒ Biskupice Podgórne

Description of the investment

The task entrusted to us by the investor consisted in the construction of external infrastructure on the premises of the LG Energy Solution production plant. The work took place while the facilities were in operation, which required an appropriate schedule and coordination of tasks so that they did not interfere with the investor’s business operations. The short deadline for completion and multiple stages of the investment necessitated the introduction of a two-shift working system. An additional challenge was the very detailed commissioning process, as the investment was to be completed before the arrival of the CEO of LG.   

Main stages of the project:

  • construction of asphalt roads
  • construction of a sports zone consisting of volleyball and basketball courts along with necessary infrastructure
  • delivery of three guard houses with the necessary infrastructure
  • delivery of an LPR system for license plate recognition
  • construction work including external sanitary and electrical installations

PARKING AT THE PACK 1 BUILDING

Investor ‒ LG ENERGY SOLUTION

Investment date ‒ 2023

Place of investment ‒ Biskupice Podgórne

Description of the investment

The project included the redevelopment of the car park area at the PACK 1 building and the preparation of the necessary sanitary, electrical, and ICT infrastructure. Demolition and earthworks were carried out on an area of 2750 m². Old pavements were repaired and new roads and green areas were prepared. The project proceeded without additional problems or challenges. 

Main stages of the project:

  • demolition and earthworks
  • construction of KR4 roads
  • development of unpaved green areas
  • repair of existing surfaces
  • execution of horizontal markings

E&S BUILDING FOR LG ENERGY SOLUTION

Investor ‒ LG ENERGY SOLUTION

Investment date ‒ 2022

Place of investment ‒ Biskupice Podgórne

Description of the investment

The works included the preparation of the sanitary and sprinkler systems in the electric car battery strength testing building. The facility covers an area of 7,600 m². The project was demanding, as the works were carried out based solely on conceptual drawings, while the project documentation was being developed concurrently.

Main stages of the project:

  • supply and installation of sprinkler and hydrant systems
  • supply and installation of compressed air systems
  • supply and installation of domestic water systems
  • supply and installation of sanitary and rain water drainage systems

BUDYNEK 501 FOR LG ENERGY SOLUTION

Investor ‒ LG ENERGY SOLUTION

Investment date ‒ 2023

Place of investment ‒ Biskupice Podgórne

Description of the investment

The task consisted of the reconstruction of the offices on the first level of the 501 building within the LG complex. In the course of project delivery it became necessary for works to be carried out at the LG plant, without interrupting its normal operations. This required appropriate procedures and maintaining a particularly high level of safety. An additional challenge was the construction of independent steel structures in the new office spaces.

Main stages of the project:

  • conversion of office rooms and open space
  • demolition of existing partition walls 
  • construction of steel substructures in new office rooms 
  • construction of walls using drywall systems and Armstrong type coffered ceilings
  • installation of new PVC cladding

DEVELOPMENT LABORATORY FOR LG

Investor ‒ LG ENERGY SOLUTION

Investment date ‒ 2023

Place of investment ‒ Biskupice Podgórne

Description of the investment

Completion of works during the redevelopment of the MODULE 2 LG Energy Solution laboratory. Activities were carried out in an area of 1,400 m². The project required, among other things, the dismantling of walls and ceilings, as well as the removal and re-preparation of ventilation ducts During the execution of the tasks, difficulties arose in relation to short-circuiting ventilation systems containing EX equipment, but the measures taken eliminated this problem. In addition, due to the limited load-bearing capacity of the ceiling, the installation of the steel substructure as well as the finishing of the steel structure reinforcing the ceiling where the escape routes are located presented an additional challenge. 

Main stages of the project:

  • complete dismantling and reconstruction of walls and ceilings made of sandwich panels, as well as door and window joinery
  • construction of KG board walls, Armstrong coffered ceilings, and PVC flooring
  • dismantling of existing ventilation ducts, compressed air and nitrogen installations, followed by adjustment of fire installations to the new room layout
  • installation of ventilation and air conditioning systems, including explosion-proof units (EX)
  • preparation of new installations for compressed technical gases – hydrogen, argon, and air
  • installation of electrical and fire alarm system installations